
Living Room Selection
Photo Reference: YH-M282
Ask About This Reference ↗
YEINIHOME manufactures and supplies furniture for serviced apartments and apartment developments. Based in Foshan, China, we work from unit plans, CAD drawings and reference images to review the pieces, materials and quantities needed for your project.
For developers, operators and designers purchasing furniture across repeated layouts, start with the unit types, unit counts and the differences between each furniture package.
Use these living, bedroom, dining and occasional-furniture references to begin the selection. Send the reference number with your plan and quantities so dimensions, materials and the supplied items can be discussed together.

Photo Reference: YH-M282
Ask About This Reference ↗
Photo Reference: YH-M398
Ask About This Reference ↗
Photo Reference: YH-M392
Ask About This Reference ↗
Photo Reference: YH-M332
Ask About This Reference ↗For a serviced apartment or build-to-rent project, a studio, a one-bedroom apartment and a larger unit may share some furniture while needing different dimensions or quantities. Keep one schedule with separate configurations for the actual layouts in your project.
| Package Input | What to Record |
|---|---|
| Unit types | The layout reference and number of units for each type. |
| Furniture per unit | Item codes, dimensions, materials and quantities for that layout. |
| Shared items and exceptions | Which specifications repeat and which sizes or finishes change. |
| Project totals | Unit quantities, furniture totals and any separately listed communal areas. |
Send the schedule with your plans for a project quotation. Keep optional items and later phases separate from the base request, and check the total against the final unit mix.
If your brief includes an indoor lobby or shared lounge, list its sofas, lounge chairs and tables separately from the furniture inside each apartment. Record the layout, dimensions, materials and quantities for these areas as their own part of the request.
Discuss the individual pieces and their intended use with YEINIHOME. Confirm product requirements and the supplied scope before approving the order.
Review Lounge Chairs for Shared Interior Spaces · Explore Lounge Chairs
YEINIHOME can work from CAD drawings, renderings and reference images, review construction details and develop furniture for the agreed specification. Materials and finishes can be discussed across the living, dining and bedroom pieces.
Approve the dimensions, finish references and required samples against a named drawing revision. Record any accepted alternative against its item code before releasing that specification for production.
We manufacture through our own factory and specialist production partners. The supplied products, sample work and delivery arrangements are confirmed for each order.
Furniture Sourcing for Designers and Fit-Out Teams · Review the Order Process
Use the dedicated villa and whole-home furniture solution to organise the living, dining and bedroom selections for one residence. Keep that room list separate from the repeated-unit schedule used for apartment developments.

keep unit types, repeated items and differences traceable.

organise room lists, drawings and supply boundaries.

compare the included scope and proposed alternatives.



Send the unit types, unit counts, floor plans and furniture quantities, with any drawings or reference images. The serviced apartment furniture package guide helps organise the item list.
Start with the required items and quantities, then separate the base package from optional changes. Record delivery and any other quoted services separately. Use the whole-home budget guide to review the scope.
Yes. Use one master schedule with separate quantities and specifications for each unit type. Combine items only when the approved dimensions, materials and finishes match. See the serviced-apartment package guide.
Keep labelled physical samples and link each reference to the furniture item and room. Record approved variation and any replacement. The finish schedule guide provides a record structure.
Discuss the proposed phases before ordering. Quantities, packing labels, storage and site readiness need agreement for the project. Use the phased delivery guide to prepare that discussion.
Record the affected item, drawing, finish and quantities, then confirm the price or schedule consequences before approving the change. Follow the furniture change-control guide to keep the current instruction clear.
Yes. Send the unit plan and the drawings or references for the required pieces. YEINIHOME can review the construction details and develop the furniture specification for approval before production.
Yes. List the lobby or shared-lounge items separately from the apartment sets, with their own dimensions, quantities and intended use. Confirm the products and any service boundaries in the quotation.
Tell YEINIHOME the project destination and the furniture you need. Include the unit types and counts, and list any indoor shared-area furniture separately.
You can describe the available drawings in your message and share the files during follow-up.