Request a Quote 0 ↗
INTERIOR DESIGNERS & FIT-OUT TEAMS

Furniture Sourcing From Your Drawings And Design References

Bring the room plans, furniture references and finish choices for your project. YEINIHOME can review CAD drawings, develop production details and make samples for the furniture specification you approve.

Based in Foshan, China, we manufacture through our own factory and specialist production partners. The pieces, sample work and supply scope are agreed for each order.

Discuss Your Design Brief ↗
Curved sofas and coffee tables coordinated in a residential living room
Curved seating and coffee tables coordinated within a residential living space.

Start With The Decisions Already Made

A measured drawing, a moodboard and a material sample answer different questions. Give each furniture item a code and keep its current references together.

Your InputWhat It DefinesWhat Still Needs Agreement
CAD plans or elevationsRoom layout, furniture dimensions and interfaces.Drawing revision, missing dimensions and items requiring production details.
Reference images or renderingsShape, appearance and the intended relationship between pieces.Construction, dimensions, upholstery and the items actually supplied.
Finish references or physical swatchesMaterial and colour direction.The approved material code, sample and acceptable alternatives.
Furniture scheduleItems, quantities and placement within the project.Open choices, optional items and the person approving each change.

Use the furniture RFQ checklist to organise a larger brief. You can describe the available files in your enquiry and share them during follow-up.

Review Production Details Before Approval

Drawing Review

YEINIHOME can review the available drawings and discuss dimensions, materials or construction alternatives. Record the questions that remain open against the item code.

Production Details

Keep the proposed dimensions, construction and finish references on a named revision. A visual reference can begin the discussion; the approved specification defines the furniture to be made.

Sample Approval

Sample production is available before a bulk order. Agree what the sample must show, who reviews it and how any accepted changes will be recorded.

See The Order And Approval Process ↗ · View Our Factory And Workshop Photographs ↗

Worker fitting upholstery to a sofa in a workshop
Review the upholstery and finish for the selected furniture specification.
Finished curved sofas at our own factory
Curved sofas at our own factory. Reference images do not define the exact version in your project.

Keep Changes Attached To The Furniture Item

If a dimension, finish or construction detail changes, record the item code, previous revision, proposed revision and the person authorised to approve it. Ask for any price or timing change to be identified before the revised item is released for production.

The room and sample approval guide helps organise the approval record. For coordinated materials, keep physical samples with the finish schedule.

Connect The Brief To The Right Project

Identify fitted work, lighting, site installation and other interfaces separately. Confirm the supplied products and the parties responsible for work outside the furniture order.

Material And Approval Resources

Questions From Design Teams

Can A Moodboard Start The Discussion?

Yes. Send it with the intended rooms, quantities and any dimensions already known. Confirm the proposed construction, materials and dimensions before treating the selection as an approved specification.

Can You Review Our CAD Drawings?

Yes. YEINIHOME can review CAD drawings, develop production details and discuss material or construction alternatives. Final dimensions, quantities and the drawing revision need agreement before production.

How Should We Approve A Finish Change?

Identify the furniture item and the material reference being replaced. Keep the approved sample and revised specification together, and confirm any effect on price or timing before proceeding.

Does The Furniture Order Include Site Installation?

Confirm installation, site handling, fitted work and other services separately in the quotation. A room image or design drawing does not establish the included supply scope.

Send The Furniture Brief For Review

Include the project type and destination, furniture quantities, available drawings, finish references and the decisions still open. Identify who will approve drawings, materials and samples.

Discuss Your Drawings And Furniture Schedule ↗

YOUR PROJECT / YOUR SELECTION

Discuss Your Project Selection

Share the project type, furniture list and quantities. Mention the drawings or finish references you have ready.

sale@yeinihome.com
Discuss On WhatsApp ↗

Page Project Enquiry

Your details are used to handle your enquiry. Privacy Notice.

Scroll to Top